Displays that show up on time, for the life of your product
A display program is more than a part number. DCL Technologies, Inc. plans the buy, holds the stock, moves the freight, watches the component lifecycle and structures the terms, so your line keeps running and your cash isn’t tied up in inventory.
How a DCLTEK supply program works
Logistics
DCLTEK and our logistics partners move product from our factory partners in Asia to your dock, domestic or international. We plan ship modes, routes and timing against your schedule, and we tell you early when something changes.
- Domestic and international freight: ocean, air and ground
- Dock-to-dock service: factory floor to your receiving dock
- Prepay and add: freight on your invoice, one less vendor to manage
- Flexible Incoterms: quoted to fit your process
Inventory programs
We hold the stock so you don’t have to. Inventory programs give you parts when you need them, fewer stock-outs and faster RMA replacements, without carrying the inventory on your books.
In practice: for an equipment OEM’s 7-inch display, DCLTEK runs an annual blanket order and keeps a consignment stock area at the customer’s warehouse filled against forecast and pull rates. Read the example
- Our stock, your warehouse: consigned in-plant store you draw from as needed
- Safety stock: buffer stock held against your blanket order
- Hot-swap stock: replacement units ready for fast field exchange
- Replenishment planning: we watch pull rates and reorder ahead of you
- Returns management: RMAs handled through our quality management system
Lifecycle management
We design for longevity from the start, aiming for at least three to five years without change, often longer. When a panel, IC or material is headed for end-of-life, we typically hear four to six months ahead and come to you with a go-forward plan, not just a notice.
In practice: when the driver ICs behind a customer’s 10-inch panel were discontinued, we brought several paths to the table, from buying and storing remaining panels to qualified alternates. The customer chose an alternate with a multi-year runway. Read the example
- Advance EOL notice and a recommended plan
- Last-time buys sized to your forecast
- Stocking of critical materials, such as LCD cells, held for future builds
- Drop-in or near-drop-in alternates with expedited samples
Risk management
Factories change MOQs, raw materials run short and ports close. We plan for it: dual or triple sourcing critical components, staying close to supplier roadmaps, and having resident-in-country staff at our factory partners who see problems before they reach you.
In practice: when a factory raised its minimum order from 120 to 500 pieces overnight and rejected an open PO, DCLTEK had a second source and three options on the customer’s desk within two days. Read the example
- Dual and triple sourcing of critical components
- Supplier roadmap reviews to catch changes early
- Pre-buys of long-lead materials
- Multiple factory tooling for high-volume programs
ERP & customer portal
Order confirmations, shipping notices, invoices and RMA updates come to you automatically from our ERP. The online customer portal gives you 24/7 access to your account, so you aren’t waiting on an email to get an answer.
- Account statements and invoices
- New orders and open-order status
- Credit memos and RMA status
- Quotes and proposals
Financing
Large display buys shouldn’t strain your cash flow. We structure terms around how you build and sell, including splitting payment on a single large shipment.
In practice: to let a customer take a 500-piece shipment at volume pricing, we offered to split the invoice: 200 pieces at Net 30, 150 at Net 60 and 150 at Net 90.
- Trade credit: buy now, pay on terms
- Consigned inventory: DCLTEK owns the stock until you use it
- Credit lines: a revolving line for repeat purchases
- Staggered billing: payment spread across a large shipment
- Early-payment discounts: save on invoices you pay early
Recent supply chain examples
Real programs, with customer names left out.
Never stocked out on a 7-inch display
- Situation
- An equipment OEM needed a dependable 7-inch display supply and didn’t want to carry the inventory.
- What we did
- Dual-sourced the LCD cell and tooled the product at two factories. Pre-bought cells for future demand and stocked cables. Set up an annual blanket order with a consignment stock area at the customer’s warehouse.
- Result
- DCLTEK manages stock levels against forecast and pull rates. The customer pulls parts as they build and pays as they use them.
A plan when the panel went end-of-life
- Situation
- The driver ICs on a high-volume customer’s 10-inch panel were discontinued, and a last-time buy of the existing cell wasn’t available.
- What we did
- Located remaining compatible panel stock that could be bought and stored. Qualified alternates with matching timing and interface, and mapped out the cable and mechanical changes. Laid out a long-term option built for many years of supply.
- Result
- The customer chose one of the alternates and has a multi-year supply runway.
A sudden MOQ change, solved in two days
- Situation
- Mid-order, a factory raised its minimum from 120 to 500 pieces and rejected a building-systems OEM’s open PO.
- What we did
- Lined up a second source with a 100-piece minimum. Negotiated one final 120-piece run with the original factory. Offered staggered billing so the 500-piece volume price was an option without the cash hit.
- Result
- The customer placed the 120-piece run to keep the program moving, with a second source and volume pricing ready for future orders.
More engineering stories are on our case studies page.
Supply chain questions
How does consignment inventory work?
What happens when a display or component goes end-of-life?
Can you hold safety stock for us?
What if the factory’s minimum order is more than we need?
Which Incoterms do you offer?
Do you offer payment terms?