Type: Supply continuityIndustry: Commercial equipment (OEM)Product: 50+ custom cable assemblies and harnesses per machine familyVolume: About 400,000 cable assemblies a yearOutcome: One supplier for the full cable set, across two contract manufacturers

The customer

A high-volume OEM of connected commercial equipment. Production is split between two contract manufacturers that build different parts of the machine, and DCLTEK has supplied the cable assemblies since 2021.

The challenge

Each machine is full of wiring: power, data, sensors and actuators, packed around moving parts and liquids. The cable set had to keep up with a product that never stopped changing.

  • More than 50 different assemblies. Power, USB, Ethernet, sensor and actuator cables, many with over-molded ends.
  • Constant design revisions. The customer’s engineers keep improving the machine, so cables are revised again and again. Some part numbers are past their tenth revision.
  • Approved materials only. Every assembly has to be built from the customer’s approved material list, with no substitutions.
  • Two contract manufacturers, two cable lists. Each contract manufacturer builds a different part of the machine and has its own cable list. Both need the right revision of every cable, on time.
  • High volume, tight schedules, competitive pricing. About 400,000 cable assemblies a year, against production schedules that don’t move, on a program that is competitively quoted.

What DCLTEK did

  1. Took on the whole cable set. Instead of splitting the wiring across several vendors, DCLTEK supplies the full set of assemblies for the machine, with one US-based point of contact and our factory partner building them.
  2. Built the complex ones. The set covers:
    • 24 VDC power and power-switch cables
    • USB cables with ferrites for noise suppression
    • Cat5e Ethernet cables with RJ45 ends
    • sensor cables
    • actuator harnesses for pumps and valves
    • LED cables
    • over-molded assemblies
  3. Controlled every revision. Each design change becomes a new revision of the part number, and every order is placed at a specific revision. Each contract manufacturer receives the revision it is building.
  4. Held the material line. Assemblies are built from the approved materials only. Substitutions don’t happen without the customer’s sign-off.
  5. Ran two cable lists as one program. Each contract manufacturer orders from its own cable list for the part of the machine it builds. DCLTEK manages both lists together, with the same revision and material control.

The result

  • One supplier for 50+ assemblies. The full cable set comes from one source.
  • About 400,000 assemblies a year. Delivered against two contract manufacturers’ production schedules, each with its own cable list.
  • Design changes absorbed in production. Revision after revision has gone into production through the same supplier.
  • A long-running program. DCLTEK has supplied this customer’s cables since 2021.

Why it matters

On a high-volume machine, cables are rarely the headline, but a wrong revision, an unapproved material or a late lot can stop a production line just as surely as a missing circuit board. Putting the whole cable set under one supplier, with strict revision and material control, keeps the line moving while the product keeps improving.